Got an electric vehicle? Downtown Banff now has seven stalls to plug into at the Bear Street Parkade. The Town of Banff installed six new Level 2 charging stalls on the first floor, and upgraded its existing public charger to match.
Each stall charges at 10 kilowatts. That suits a car parked while the driver works, shops or runs errands downtown. The six new stalls run off three dual chargers.
Connectors and costs
The site has five North American Charging Standard (NACS) connectors, used by Tesla and most newer North American EVs. Two J1772 connectors cover many other EVs and older models.
Charging costs $0.30 per kilowatt-hour. Payment goes through the Electric Avenue app.
An idling fee applies if a vehicle stays parked without actively charging. It matches Visitor Pay Parking rates and runs from 8 a.m. to 8 p.m. There is no idling fee from 8 p.m. to 8 a.m.
The Town's example: an EV using about 20 kWh per 100 km would need roughly 2 hours and $6 at one of these chargers for 100 km of driving. The Town puts a gasoline vehicle at about $17.30 for the same distance.
Who paid for it
The project cost $22,400. Alberta Municipalities contributed $8,550, and the Town put in $13,850 from Visitor Pay Parking revenue. The program is funded in part by Natural Resources Canada's Zero Emission Vehicle Infrastructure Program.
The Town expects charging and idling fees to cover electricity, payment-platform and maintenance costs. Any surplus goes back to the Visitor Pay Parking Operating Reserve.
Mayor Corrie DiManno says the Town is "pleased to support people who are taking climate action by driving EVs." Private vehicles are Banff's top source of greenhouse gas emissions, and the Town is aiming to cut emissions 30% by 2030 and 80% by 2050, against 2016 levels.
For the bigger picture, see the Town's Renewable Energy Transition Roadmap.